Hi Sir,
Thank you for your informative questing. I have 110 block on the telco room connected to a 24 port patch panel via 25 pair cable. The service provider will patch to the 110 block to give data connection to the client vie this 25 pair - patch panel. Patch panel will be connected to the switch of the client. So i just want to know which pair should be terminated to patch panel when i have this kind of set up.
And how do i test this set up since this is an existing facility. I want to verify if the connection between 110 pair and patch panel is still good.
Thank you again in advance.
Vermont