So for my work we're building a new rack server with 10 PCs in it. I've built all the PCs and now it's time to work on putting everything in the rack. I was just looking for some tips from people with experience in building these on maybe which things to install first. I've got the 10 PCs, sliding rails, 2 PDUs, a switch and the rack itself (pre-assembled). I also bought cage nuts because I've installed rails before on other racks and it seems like they'll make it a lot easier. If it helps any, the server rack I purchased is an APC AR3100