I have two GPUs; RTX 2060 and 1660 Super. I'm doing mining. I have MSI B450M Bazooka. My RTX 2060 connected x16 PCI port and all my monitors connected to RTX 2060. 1660 Super connected x1 PCI port with Riser. The problem is Windows sees 1660 Super as main GPU. GPU#0: 1660 Super GPU#1: RTX 2060. I want the 1660 keep mining while i'm playing games with 2060. But some games (like BF2042, FIFA 22) launch the games from GPU#0. I installed nvidia driver while 1660 Super not connected but when i connect 1660 Super, it is again GPU#0. I want to make RTX 2060 GPU#0 and 1660 Super GPU#1. Is there any way to fix this?