Urgent PSU advice! Have 1 hour to change order if needed!!!!

Stealthza

Reputable
Nov 9, 2015
11
0
4,510
Hi guys, so i just ordered a Antec neo eco 650w atx modular PSU and i'm having serious trouble finding reviews / finding the PSU on antec's website....

needless to say i'm starting to have doubts, for the next hour i can switch to the Antec VP700P 700W 80+ PSU but if nothing is wrong with the 650w i would prefer the modular design!

Please can somebody give me some advice, it would be much appreciated at this point as this is the last of my money that i have for my rig!
 
Solution
http://www.antec.com/pdf/flyers/NE650C_flyer_EN_20131008.pdf
Is this the one?
That Flyer has model numbers and phone numbers. Should be a good place to start.

In case the link dies:

NE650C
NeoECO CLASSIC
SPECIFICATIONS:
• 650W Continuous Power - Guaranteed 650W of Continuous Power from Antec
• 80 PLUS® BRONZE certified - Up to 88% efficient, to reduce your electricity bill
• AQ3 - Antec Quality 3 year warranty and lifetime global 24/7 support
• 120 mm DBB Silence - Whisper-quiet high-quality double ball bearing fan with
long lifetime
• Thermal Manager - An advanced low voltage fan control for optimal heat &
noise management
• Multi PCI-E - 4 PCI-E connectors for multiple GPU support
• 92.3% +12V - Output for maximum CPU & GPU support...
I had to order a PSU urgently because of a design project due for monday, I rushed to find the best PSU for my price range and it came to a tie between the 2 i listed above.

I know antec to be an extremely reliable brand so i figured hay dropping 50w for modular design is worth it, and then when i started looking into the PSU it appears that it barely exists which raises suspicions. My pc is basically on 24/7 as everything i do involves it, and having spent the last of my money for the month, i need some advice.
 


Did you try the linked solution links?
 
Yes i had a look thanks, as far as i can tell it's most likely to be part of the unreviewed PSU's simply because that's the only antec neo eco brand i could find in the list, my issue comes with the fact that not even Antec has this PSU on their website, which seems very strange
 
http://www.antec.com/pdf/flyers/NE650C_flyer_EN_20131008.pdf
Is this the one?
That Flyer has model numbers and phone numbers. Should be a good place to start.

In case the link dies:

NE650C
NeoECO CLASSIC
SPECIFICATIONS:
• 650W Continuous Power - Guaranteed 650W of Continuous Power from Antec
• 80 PLUS® BRONZE certified - Up to 88% efficient, to reduce your electricity bill
• AQ3 - Antec Quality 3 year warranty and lifetime global 24/7 support
• 120 mm DBB Silence - Whisper-quiet high-quality double ball bearing fan with
long lifetime
• Thermal Manager - An advanced low voltage fan control for optimal heat &
noise management
• Multi PCI-E - 4 PCI-E connectors for multiple GPU support
• 92.3% +12V - Output for maximum CPU & GPU support
• CircuitShield™ - Full suite of industrial grade protections
• Japanese Heavy-duty Caps - High-performance Japanese capacitors ensure
tightest DC stability and regulation
• ErP Lot 6 - Compliant to the toughest energy standard available

0761345286541
0761345111874 AU
0761345056526 EC
0761345111867 IC
0761345111881 KR
0761345113397 ZA
0761345112871 AR
0761345112383 BR
0761345056533 GB
0761345111898 JP
0761345111904 TW

 
Solution