Approximate Purchase Date: as soon as possible
Budget Range: 500-1200
System Usage from Most to Least Important: Math Computations, Read/Write to database.
Are you buying a monitor: No, no graphics processing is going to be done on the server
Do you need to buy OS: No, most likely running a generic linux server build (possibly ubuntu server)
Location: Manhattan, NY
Parts Preferences: Intel i7 or Xeon, 1 or more cores. ECC not necessary, but I would like to experiment with RAID0/RAID10/RAID01
Overclocking: No
Additional Comments: Was looking at rackmount servers and tower servers, but this is going to be in a 100sqft undivided living space where i will sleep.
- So it must be relatively quiet.
Can't control temperature either. This will be a testing server so production level quality and uptime is not an issue, but performance needs to be decent enough so it wont become a burden to develop.
- Also considering running a web server on this in the meantime.
Budget Range: 500-1200
System Usage from Most to Least Important: Math Computations, Read/Write to database.
Are you buying a monitor: No, no graphics processing is going to be done on the server
Do you need to buy OS: No, most likely running a generic linux server build (possibly ubuntu server)
Location: Manhattan, NY
Parts Preferences: Intel i7 or Xeon, 1 or more cores. ECC not necessary, but I would like to experiment with RAID0/RAID10/RAID01
Overclocking: No
Additional Comments: Was looking at rackmount servers and tower servers, but this is going to be in a 100sqft undivided living space where i will sleep.
- So it must be relatively quiet.
Can't control temperature either. This will be a testing server so production level quality and uptime is not an issue, but performance needs to be decent enough so it wont become a burden to develop.
- Also considering running a web server on this in the meantime.