shrapnel_indie
Distinguished
Yup,
Designed or not... They'll take full advantage of the losses as an excuse to raise prices.
If it was an upgraded plant with a backup system that became underrated in the process, I'd have to blame top decision making execs, MBAs and/or Engineers for failing to upgrade the backup/conditioning systems as well.
As far as losses, that will depend on exactly how far they were in the process before failure. At step one, loss is minimal, as it's only what was in the process of being laid down at the time of failure that is ruined. (Well that goes for all steps actually, and to be honest I don't know how many get laid down at the exact same time) Greater losses will be felt further down the processing line as the step count closes in on the final step. The ventilation failure is the same way, the further down the line you get, the greater the loss if contaminated. I'll assume they'll declare everything contaminated, even if it isn't. It's just easier to do that then check each stage for contamination and level of failure do to the power loss.
Designed or not... They'll take full advantage of the losses as an excuse to raise prices.
If it was an upgraded plant with a backup system that became underrated in the process, I'd have to blame top decision making execs, MBAs and/or Engineers for failing to upgrade the backup/conditioning systems as well.
As far as losses, that will depend on exactly how far they were in the process before failure. At step one, loss is minimal, as it's only what was in the process of being laid down at the time of failure that is ruined. (Well that goes for all steps actually, and to be honest I don't know how many get laid down at the exact same time) Greater losses will be felt further down the processing line as the step count closes in on the final step. The ventilation failure is the same way, the further down the line you get, the greater the loss if contaminated. I'll assume they'll declare everything contaminated, even if it isn't. It's just easier to do that then check each stage for contamination and level of failure do to the power loss.