Yeah, I preordered Medal of Honor Pacific Assault from EB and they have updated me 3-4 times with new release dates. Instead of a 3 month wait, I'll be waiting 9+ months. I hope this date for Doom3 is in concrete for a change.
ABIT IS7, P4 2.6C, 512MB Corsair TwinX PC3200LL, Radeon 9800 Pro, Santa Cruz, TruePower 430watt