Urgent PSU advice! Have 1 hour to change order if needed!!!!

Stealthza

Reputable
Nov 9, 2015
11
0
4,510
Hi guys, so i just ordered a Antec neo eco 650w atx modular PSU and i'm having serious trouble finding reviews / finding the PSU on antec's website....

needless to say i'm starting to have doubts, for the next hour i can switch to the Antec VP700P 700W 80+ PSU but if nothing is wrong with the 650w i would prefer the modular design!

Please can somebody give me some advice, it would be much appreciated at this point as this is the last of my money that i have for my rig!
 
Solution
http://www.antec.com/pdf/flyers/NE650C_flyer_EN_20131008.pdf
Is this the one?
That Flyer has model numbers and phone numbers. Should be a good place to start.

In case the link dies:

NE650C
NeoECO CLASSIC
SPECIFICATIONS:
• 650W Continuous Power - Guaranteed 650W of Continuous Power from Antec
• 80 PLUS® BRONZE certified - Up to 88% efficient, to reduce your electricity bill
• AQ3 - Antec Quality 3 year warranty and lifetime global 24/7 support
• 120 mm DBB Silence - Whisper-quiet high-quality double ball bearing fan with
long lifetime
• Thermal Manager - An advanced low voltage fan control for optimal heat &
noise management
• Multi PCI-E - 4 PCI-E connectors for multiple GPU support
• 92.3% +12V - Output for maximum CPU & GPU support...
I had to order a PSU urgently because of a design project due for monday, I rushed to find the best PSU for my price range and it came to a tie between the 2 i listed above.

I know antec to be an extremely reliable brand so i figured hay dropping 50w for modular design is worth it, and then when i started looking into the PSU it appears that it barely exists which raises suspicions. My pc is basically on 24/7 as everything i do involves it, and having spent the last of my money for the month, i need some advice.
 


Did you try the linked solution links?
 
Yes i had a look thanks, as far as i can tell it's most likely to be part of the unreviewed PSU's simply because that's the only antec neo eco brand i could find in the list, my issue comes with the fact that not even Antec has this PSU on their website, which seems very strange
 
http://www.antec.com/pdf/flyers/NE650C_flyer_EN_20131008.pdf
Is this the one?
That Flyer has model numbers and phone numbers. Should be a good place to start.

In case the link dies:

NE650C
NeoECO CLASSIC
SPECIFICATIONS:
• 650W Continuous Power - Guaranteed 650W of Continuous Power from Antec
• 80 PLUS® BRONZE certified - Up to 88% efficient, to reduce your electricity bill
• AQ3 - Antec Quality 3 year warranty and lifetime global 24/7 support
• 120 mm DBB Silence - Whisper-quiet high-quality double ball bearing fan with
long lifetime
• Thermal Manager - An advanced low voltage fan control for optimal heat &
noise management
• Multi PCI-E - 4 PCI-E connectors for multiple GPU support
• 92.3% +12V - Output for maximum CPU & GPU support
• CircuitShield™ - Full suite of industrial grade protections
• Japanese Heavy-duty Caps - High-performance Japanese capacitors ensure
tightest DC stability and regulation
• ErP Lot 6 - Compliant to the toughest energy standard available

0761345286541
0761345111874 AU
0761345056526 EC
0761345111867 IC
0761345111881 KR
0761345113397 ZA
0761345112871 AR
0761345112383 BR
0761345056533 GB
0761345111898 JP
0761345111904 TW

 
Solution

TRENDING THREADS